Differences between revisions 5 and 6
Revision 5 as of 2011-01-31 17:07:21
Size: 848
Editor: dhcp-115
Comment:
Revision 6 as of 2011-02-11 17:37:12
Size: 1805
Editor: dhcp-115
Comment:
Deletions are marked like this. Additions are marked like this.
Line 14: Line 14:

=== 02/04/2011 ===
Arrived at 10:00AM for weekly lab meeting. Changed out labs, discussed state of the labs after snow day on 2/02/2011. Replaced equipment, cursed snow and all that it stands for.

=== 02/07/2011 ===
Arrived at 10:40 AM. Discussed LaTeX project with Brett, started exploring file location. Started on e/M tube project, replaced mounts on two e/M tube set-ups. Returned in the afternoon, did one more, left instructions for Brandon to finish up e/M tube project. Did minor checks, removing broken equipment from labs.

=== 02/09/2011 ===
Arrived at 10:45AM. Checked status of several labs, removed extra equipment from 248 lab. Checked on status of e/M tubes, noted that we were out of additional mounting hardware. Did not return in the afternoon due to tedious phone interview.

=== 02/11/2011 ===
Arrived at 10:00AM for weekly meeting. Discussed what needed to happen this week, removed equipment from 104 lab. Updated wiki.

Task Log: Tim Cochrane

01/26/2011

Began at 1:30PM. Removed week 1 set-ups from TA Prep room and replaced them with next week's labs. Removed lab equipment from 248, returned to storage. Started on e/M bulb modernization project, began by gluing felt to the top of the new, wider brackets. Built wiki page for task log.

01/27/2011

n/a

01/28/2011

Arrived at 10:00AM for meeting. Added help labels to printers, reorganized and reformatted areas of the Wiki, replaced central post on speaker assemblies for S-2

01/31/2011

Arrived 10:05AM for daily work. Updated wiki with new weekly Spring task list, other minor edits/changes in other areas. Located two more non-functioning speakers, began repair work. Removed non-working Vernier from 201 lab.

02/04/2011

Arrived at 10:00AM for weekly lab meeting. Changed out labs, discussed state of the labs after snow day on 2/02/2011. Replaced equipment, cursed snow and all that it stands for.

02/07/2011

Arrived at 10:40 AM. Discussed LaTeX project with Brett, started exploring file location. Started on e/M tube project, replaced mounts on two e/M tube set-ups. Returned in the afternoon, did one more, left instructions for Brandon to finish up e/M tube project. Did minor checks, removing broken equipment from labs.

02/09/2011

Arrived at 10:45AM. Checked status of several labs, removed extra equipment from 248 lab. Checked on status of e/M tubes, noted that we were out of additional mounting hardware. Did not return in the afternoon due to tedious phone interview.

02/11/2011

Arrived at 10:00AM for weekly meeting. Discussed what needed to happen this week, removed equipment from 104 lab. Updated wiki.


Tim Cochrane

il: TimTaskLog (last edited 2011-02-21 20:15:31 by dhcp-115)