Size: 599
Comment:
|
Size: 2310
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 11: | Line 11: |
=== 01/31/2011 === Arrived 10:05AM for daily work. Updated wiki with new weekly Spring task list, other minor edits/changes in other areas. Located two more non-functioning speakers, began repair work. Removed non-working Vernier from 201 lab. === 02/04/2011 === Arrived at 10:00AM for weekly lab meeting. Changed out labs, discussed state of the labs after snow day on 2/02/2011. Replaced equipment, cursed snow and all that it stands for. === 02/07/2011 === Arrived at 10:40 AM. Discussed LaTeX project with Brett, started exploring file location. Started on e/M tube project, replaced mounts on two e/M tube set-ups. Returned in the afternoon, did one more, left instructions for Brandon to finish up e/M tube project. Did minor checks, removing broken equipment from labs. === 02/09/2011 === Arrived at 10:45AM. Checked status of several labs, removed extra equipment from 248 lab. Checked on status of e/M tubes, noted that we were out of additional mounting hardware. Did not return in the afternoon due to tedious phone interview. === 02/11/2011 === Arrived at 10:00AM for weekly meeting. Discussed what needed to happen this week, removed equipment from 104 lab. Updated wiki. === 02/14/2011 === Arrived at 10:10AM. Returned extra cart to working order by removing detritus which had accumulated. Did a walk-through of all labs, making sure they were tidy/set-up. Removed extra set-ups from 248 lab. Prepared cart for Tuesday night change-over of 104 with 16 set-ups of E-2-100. Edited wiki, adding weekly tasks for Week 5. Started working on LaTeX project by familiarizing self with LaTeX mark-up language, installing LaTeX editor on computer, and locating files on AFS-space. |
Task Log: Tim Cochrane
01/26/2011
Began at 1:30PM. Removed week 1 set-ups from TA Prep room and replaced them with next week's labs. Removed lab equipment from 248, returned to storage. Started on e/M bulb modernization project, began by gluing felt to the top of the new, wider brackets. Built wiki page for task log.
01/27/2011
n/a
01/28/2011
Arrived at 10:00AM for meeting. Added help labels to printers, reorganized and reformatted areas of the Wiki, replaced central post on speaker assemblies for S-2
01/31/2011
Arrived 10:05AM for daily work. Updated wiki with new weekly Spring task list, other minor edits/changes in other areas. Located two more non-functioning speakers, began repair work. Removed non-working Vernier from 201 lab.
02/04/2011
Arrived at 10:00AM for weekly lab meeting. Changed out labs, discussed state of the labs after snow day on 2/02/2011. Replaced equipment, cursed snow and all that it stands for.
02/07/2011
Arrived at 10:40 AM. Discussed LaTeX project with Brett, started exploring file location. Started on e/M tube project, replaced mounts on two e/M tube set-ups. Returned in the afternoon, did one more, left instructions for Brandon to finish up e/M tube project. Did minor checks, removing broken equipment from labs.
02/09/2011
Arrived at 10:45AM. Checked status of several labs, removed extra equipment from 248 lab. Checked on status of e/M tubes, noted that we were out of additional mounting hardware. Did not return in the afternoon due to tedious phone interview.
02/11/2011
Arrived at 10:00AM for weekly meeting. Discussed what needed to happen this week, removed equipment from 104 lab. Updated wiki.
02/14/2011
Arrived at 10:10AM. Returned extra cart to working order by removing detritus which had accumulated. Did a walk-through of all labs, making sure they were tidy/set-up. Removed extra set-ups from 248 lab. Prepared cart for Tuesday night change-over of 104 with 16 set-ups of E-2-100. Edited wiki, adding weekly tasks for Week 5. Started working on LaTeX project by familiarizing self with LaTeX mark-up language, installing LaTeX editor on computer, and locating files on AFS-space.