Task Log: Brandon Biagioli

01/26/2011

Began at 4:00 PM. Created task log. Glued black felt pieces to wooden things, and trimmed the felt. Finished at 5:00 PM.

02/07/2011

Began at 3:30 PM. Assembled E/M tubes. Finished at 5:30 PM.

02/09/2011

Began at 3:45 PM. Checked labs for broken equipment (found none). Finished at 4:00 PM.

02/14/2011

Began at 3:55 PM. Loaded carts with equipment for Wednesday. Worked on E/M assemblies (finished two). Finished at 5:55 PM.

02/16/2011

Began at 3:50 PM. Worked on E/M assemblies (finished six). Finished at 5:00 PM.

02/21/2011

Began at 3:50 PM. Finished the last E/M assembly. Finished at 4:15 PM.

03/07/2011

Began at 3:45 PM. Checked burnt-out E/M bulbs. Finished at 4:40 PM.

03/09/2011

Began at 3:45 PM. Checked labs for low supplies, fixed an electroscope. Finished at 4:25 PM.

03/21/2011

Began at 4:15 PM. Fixed 3 electroscopes. Finished at 4:30 PM.

03/23/2011

Began at 3:35 PM. Set up the TA prep room, removed E-3 equipment from 3314. Finished at 4:45 PM.

03/28/2011

Began at 3:35 PM. Removed make-up equipment from 3314. Finished at 4:25 PM.

03/30/2011

Began at 3:30 PM. Removed telescopes and mirrors from old optics mounts, put the mirrors into new Pasco mounts. Finished at 4:45 PM.

04/4/2011

Began at 3:30 PM. Put one setup of E-2 and L-5 in 3136. Finished at 4:10 PM.

04/6/2011

Began at 4:10 PM. Tried to figure out how to operate an oscilloscope. After a few internet tutorials, couldn't find anything wrong with one oscilloscope, and put it away. Finished at 5:00 PM.

04/11/2011

Began at 3:45 PM. Checked a function generator, brought some broken equipment down to Billie, and checked lab supplies. Finished at 4:20 PM.

04/11/2011

Began at 3:45 PM. Put away working oscilloscopes, refilled a few spools with black dacron string. Finished at 4:45 PM.


Brandon Biagioli

il: Brandon's Task Log (last edited 2011-04-18 21:48:00 by ryan)