Line 5: Line 5:
-Design __'''Design '''__
Line 7: Line 7:
Various designs exist, some more complicated than others. Essentially is comprised of a sealed digesting vessel in which compost, manure and/or vegetable scraps combined with water and a microbial innoculation produce methane as a by product of microbial metabolism. The gas is then drawn off and burned. Difference in designs mainly revolve around how to accomplish this second step. Some employ a separate gas storage vessel, more simple designs collect the gas above the digesting slurry. Youtube video of a design that I find is sofisticated enough without being difficult for a preliminary effort: http://www.youtube.com/watch?v=l5e_2W71jMM Various designs exist, some more complicated than others. Essentially is comprised of a sealed digesting vessel in which compost, manure and/or vegetable scraps combined with water and a microbial inoculation produce methane as a by product of microbial metabolism. The gas is then drawn off and burned. Difference in designs mainly revolve around how to accomplish this second step. Some employ a separate gas storage vessel, more simple designs collect the gas above the digesting slurry. Youtube video of a design that I think is sophisticated enough without being difficult for a preliminary effort: http://www.youtube.com/watch?v=l5e_2W71jMM
Line 9: Line 9:
Other examples: http://www.youtube.com/watch?v=TTdreS_HN2Y Commercial example: http://www.youtube.com/watch?v=TTdreS_HN2Y
Line 11: Line 11:
-Materials Based on the above design and others two to three 50 gallon plastic tanks; PVC Tubing, connectors, etc.; manure/vegetable scraps and microbes; and the tools necessary to assemble the system seem like the basic requirements. Refinements to the basic system seem not to require too many extra materials. __'''Materials'''__
Line 13: Line 13:
-Assembly Seems simple enough if done carefully, also potentially fun. Based on the above design and others - two to three 50 gallon plastic tanks; PVC Tubing, connectors, etc.; manure/vegetable scraps and microbes; and the tools necessary to assemble the system seem like the basic requirements. Refinements to the basic system seem not to require too many extra materials, maybe a little metal working and some creative sourcing.
Line 15: Line 15:
-Testing Initial objective here to get combustible gas with a later focus on filtration and clean burning methane. __'''Assembly'''__

Seems simple enough if done carefully, also potentially fun. The time frame to get usable gas from what I understand is about two weeks after set up.

__'''Testing'''__

Initial objective here to get combustible gas with a later focus on filtration and clean burning methane. Safety important here.

Methane Digester

Construction and testing of small-scale microbial digester that produces usable methane gas.

Design

Various designs exist, some more complicated than others. Essentially is comprised of a sealed digesting vessel in which compost, manure and/or vegetable scraps combined with water and a microbial inoculation produce methane as a by product of microbial metabolism. The gas is then drawn off and burned. Difference in designs mainly revolve around how to accomplish this second step. Some employ a separate gas storage vessel, more simple designs collect the gas above the digesting slurry. Youtube video of a design that I think is sophisticated enough without being difficult for a preliminary effort: http://www.youtube.com/watch?v=l5e_2W71jMM

Commercial example: http://www.youtube.com/watch?v=TTdreS_HN2Y

Materials

Based on the above design and others - two to three 50 gallon plastic tanks; PVC Tubing, connectors, etc.; manure/vegetable scraps and microbes; and the tools necessary to assemble the system seem like the basic requirements. Refinements to the basic system seem not to require too many extra materials, maybe a little metal working and some creative sourcing.

Assembly

Seems simple enough if done carefully, also potentially fun. The time frame to get usable gas from what I understand is about two weeks after set up.

Testing

Initial objective here to get combustible gas with a later focus on filtration and clean burning methane. Safety important here.