Differences between revisions 1 and 5 (spanning 4 versions)
Revision 1 as of 2013-10-10 20:18:42
Size: 1353
Comment:
Revision 5 as of 2013-10-10 20:27:58
Size: 1513
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
-Design
Various designs exist, some more complicated than others. Essentially is comprised of a sealed digesting vessel in which compost, manure and/or vegetable scraps combined with water and a microbial innoculation produce methane as a by product of microbial metabolism. The gas is then drawn off and burned. Difference in designs mainly revolve around how to accomplish this second step. Some employ a separate gas storage vessel, more simple designs collect the gas above the digesting slurry. Youtube video of a design that I find is sofisticated enough without being difficult for a preliminary effort: http://www.youtube.com/watch?v=l5e_2W71jMM
Line 7: Line 5:
Other examples: http://www.youtube.com/watch?v=TTdreS_HN2Y      -Materials
Based on the above design and others
two to three 50 gallon plastic tanks; PVC Tubing, connectors, etc.; manure/vegetable scraps and microbes; and the tools necessary to assemble the system seem like the basic requirements. Refinements to the basic system seem not to require too many extra materials.   -Assembly
Seems simple enough if done carefully, also potentially fun.   -Testing
Initial objective here to get combustible gas with a later focus on filtration and clean burning methane.
__'''Design '''__

Various designs
exist, some more complicated than others. Essentially is comprised of a sealed digesting vessel in which compost, manure and/or vegetable scraps combined with water and a microbial inoculation produce methane as a by product of microbial metabolism. The gas is then drawn off and burned. Difference in designs mainly revolve around how to accomplish this second step. Some employ a separate gas storage vessel, more simple designs collect the gas above the digesting slurry. Youtube video of a design that I think is sophisticated enough without being difficult for a preliminary effort: http://www.youtube.com/watch?v=l5e_2W71jMM

Commercial example
: http://www.youtube.com/watch?v=TTdreS_HN2Y

__'''Materials'''__

Based on the above design and others
- two to three 50 gallon plastic tanks; PVC Tubing, connectors, etc.; manure/vegetable scraps and microbes; and the tools necessary to assemble the system seem like the basic requirements. Refinements to the basic system seem not to require too many extra materials.

__'''
Assembly'''__

Seems simple enough if done carefully, also potentially fun. The time frame to get usable gas from what I understand is about two weeks after set up.

__'''Testing'''__

I
nitial objective here to get combustible gas with a later focus on filtration and clean burning methane. Safety important here.

Methane Digester

Construction and testing of small-scale microbial digester that produces usable methane gas.

Design

Various designs exist, some more complicated than others. Essentially is comprised of a sealed digesting vessel in which compost, manure and/or vegetable scraps combined with water and a microbial inoculation produce methane as a by product of microbial metabolism. The gas is then drawn off and burned. Difference in designs mainly revolve around how to accomplish this second step. Some employ a separate gas storage vessel, more simple designs collect the gas above the digesting slurry. Youtube video of a design that I think is sophisticated enough without being difficult for a preliminary effort: http://www.youtube.com/watch?v=l5e_2W71jMM

Commercial example: http://www.youtube.com/watch?v=TTdreS_HN2Y

Materials

Based on the above design and others - two to three 50 gallon plastic tanks; PVC Tubing, connectors, etc.; manure/vegetable scraps and microbes; and the tools necessary to assemble the system seem like the basic requirements. Refinements to the basic system seem not to require too many extra materials.

Assembly

Seems simple enough if done carefully, also potentially fun. The time frame to get usable gas from what I understand is about two weeks after set up.

Testing

Initial objective here to get combustible gas with a later focus on filtration and clean burning methane. Safety important here.

None: Methane Digester (last edited 2014-06-19 20:42:40 by FranciscoSchlenker)