Size: 2055
Comment:
|
Size: 1981
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
* '''Bay:''' (A? or B?) Like [:MechanicsCabinetBayA1:(A1)] * '''Shelf:''' #1,2,3.. (Use "T" for items that are on top of that cabinet bay) |
* '''Bay:''' [:MechanicsCabinetBayA5:(A5)] * '''Shelf:''' #1 |
Line 19: | Line 19: |
||apparatus||ME, Bay B1, Shelf #2|| || ||all other parts||ME, Bay B1, Shelf #2|| || ||...||ME, Bay B1, Shelf #2|| || ||Possible supplies that are needed||Rode and Tack Cabinet|| || ||...|| In Lecture Halls|| || ||...|| Stock Cabinet || || ||...|| Stock Cabinet || || |
||Control interface||ME, Bay A1, Shelf #1|| || ||Power cord and telephone line||ME, Bay A1, Shelf #1|| || ||Projectile launcher||ME, Bay A1, Shelf #1|| || ||Monkey||ME, Bay A1, Shelf #1|| || ||Photogate||ME, Bay A1, Shelf#1|| || ||Support rod with attached electromagnet||Near door to 2241|| || |
Line 28: | Line 28: |
A. '''''This demonstration requires a minimum 24 hour notice.''''' * '''''This demonstration requires LN2''''' * '''''Back-to-Back lectures is NOT possible; We'll do one lecture one day and the other the next day.''''' |
A. This demonstration may require practice. |
Line 35: | Line 33: |
1. Make a Setup check list. 1. ... |
1. Mount the support rod to the lecture bench. 2. Place the launcher on opposite end of lecture bench and connect the power cord and telephone wire. 3. |
Line 39: | Line 38: |
1. List any Warnings.... 1. Demonstration may require practice. |
1. DO NOT look down the barrel of the projectile launcher - a spontaneous launch could take your eye! |
[:PiraScheme#Mechanics: Table of Mechanics Demonstration] |
[:MEEquipmentList: List of Mechanics Equipment & Supplies] |
[:Demonstrations:Lecture Demonstrations] |
PASCO Monkey and Hunter, 1D60.30
Location:
Cabinet: [:MechanicsCabinet:Mechanic (ME)]
Bay: [:MechanicsCabinetBayA5:(A5)]
Shelf: #1
(attachment photo showing the fully set up demonstration)
Description:
A projectile launcher is carefully aimed at a stuffed monkey which is held up by an electromagnet. The electromagnet is coupled to the launcher via the PASCO interface. The instant the projectile is launched the monkey is dropped. If everything is set up correctly, the projectile should hit the falling monkey.
Equipment |
Location |
ID Number |
|
|
|
Control interface |
ME, Bay A1, Shelf #1 |
|
Power cord and telephone line |
ME, Bay A1, Shelf #1 |
|
Projectile launcher |
ME, Bay A1, Shelf #1 |
|
Monkey |
ME, Bay A1, Shelf #1 |
|
Photogate |
ME, Bay A1, Shelf#1 |
|
Support rod with attached electromagnet |
Near door to 2241 |
|
Important Setup Notes:
- This demonstration may require practice.
Setup:
- Mount the support rod to the lecture bench.
- Place the launcher on opposite end of lecture bench and connect the power cord and telephone wire.
Cautions, Warnings, or Safety Concerns:
- DO NOT look down the barrel of the projectile launcher - a spontaneous launch could take your eye!
Demonstration:
Insert description of demonstration, how is the demonstration preformed.
attachment other photos |
attachment other photos |
attachment other photos |
attachment other photos |
References:
[:Instructional:Home]