FMCG/Experimental setup

From zhivun
Revision as of 15:01, 22 August 2016 by Zdeland (talk | contribs) (Created page with "= Initial Setup = This part of the guide will assume the array and electronics rack have been completely removed from the magnetically shielded room (like after Ron & Co. have...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Initial Setup

This part of the guide will assume the array and electronics rack have been completely removed from the magnetically shielded room (like after Ron & Co. have had a patient). In all that follows, “near side” of the bed will refer to the side closest to the door, and “far side” will be the other one, near the port where all the cables come in and out.

1. Wheel the electronics rack and tools cart into the room adjoining the MSR. The electronics rack should be placed along the desk right in front of the BTi computers, about 1m from the wall of the MSR. The tools cart can go pretty much anywhere there is room.

2. Take the magnetometer array from the tools cart and place it on the bed. The ports for the fibers and Cat5 cables should be on the far side of the bed. Channels 1 and 4 should be on the near side of the bed.

File:Example.jpg

3.