The following will assume the room coils are connected to the single-channel '''"Wyllie Supplies"''' and each individual set of shell coils is connected to the appropriate port on the back of the main control box.
 
The process of nulling the fields is somewhat difficult to explain in words, but gets easier with practice. The procedure below is not to be followed word-for-word, but can hopefully be useful as a guide.
The process of nulling the fields is very much
 
# Since we'll be using the Wyllie supplies with the room coils to null the first sensor (Channel 1 recommended, but not necessary), make sure there's a wide output current range on these supplies. Make sure the voltage range is set to "full"