==Daily Log==
'''5/10/2016''' Swapping back to short cavity. Long cavity is at 46x5. Walk mirrors at 40x3, 39x7 (pedestal location). 250 mm lens at 39x4, 700mm lens at 41x23. Pickoff at 35x3 (pedestal). Other mirrors at 31x3, 31x23.
'''12/16/15'''
Swapping back to the long cavity. Short cavity showed a lot of success: 10e-6 CW efficiency, 10e-4 when ramping. Mode matching for 1064 27 cm cavity is: Cavity at 57x2 (0,0 is corner near the computer, cavity position is marked by closest screw to 0,0 holding it down). Walk mirrors at 50,3.5 and 49,7. 250mm lens at 45,4 700mm lens at 32,18 500mm at 47,23.
'''11/9/15'''
The bright flashes turned out to just be from the ramp peaks greatly expanding when the ramp was slowed down all the way--effectively the duty cycle was higher without the peak efficiency being any more. We've abandoned the two photon experiment again for now. There's nothing guaranteed the independent and generated 1555 will be in phase so maybe there's just always a lot of interference?
We got lower finesse mirrors from ECI. They came out to be around 3500 finesse and seem very promising so far. Locking is way easier, although the efficiency is still around 10e-6 for 807 generation. The linewidth when locking actually broadens some to about 0.5 MHz so we still need to figure that out. The exciting part though is that the peak efficiency is around 10e-4 when ramping! We're working on optimizing the locking performance and increasing the pressure to a more optimal place. 8 atm should be ideal due to broadening/narrowing effects. I ordered a new regulator that could handle that but am still having problem and haven't seen anything good yet.
'''9/25/15'''
| |||