160
edits
No edit summary |
No edit summary |
||
==8/30==
1.) This week Nick and I made boxes out of black poster board and black cloth around the AOMs and the photdiodes. The significantly cut down on light.
2.) The pickoff efficiency was determined to actually be 1.5%.
3.) Solved the rest of the calibration issues. The solutions were: have the right pickoff efficiency, keep careful track of which photodiode youre using and what its gain is, and make sure both pickoff reflections are hitting the photodiode.
4.) We tried increasing the power through the SHG cavity to try and do Rabi flopping. We had to change the SRS amplifiers from the low noise setting to the high bandwidth setting so that they would respond fast enough to see the flopping. However, there were significant power fluctuations in the lazer. We weren't able to see any flopping
==8/23/2015==
1.) Pickoff efficiency is 1%. This was determined by having two photodiodes on each side of the pickoff and comparing the voltage readouts. Both reflections were focused onto the photodiode with a lens.
|