Differences between revisions 2 and 3
Revision 2 as of 2011-05-17 14:35:26
Size: 948
Editor: BrettUnks
Comment:
Revision 3 as of 2011-05-17 14:35:46
Size: 947
Editor: BrettUnks
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
This is a list of big projects that need to be completed before the end of Summer 2011:  This is a list of big projects that need to be completed before the end of Summer 2011:

This is a list of jobs that can be done anytime, check items off as you finish them:

  • Fix any broken equipment (Don't check this off, ever. There is always "something" broken)
  • Clear and Restock introductory lab rooms
  • Clean, inventory, and photograph introductory lab storage rooms
  • Clean, inventory, and photograph 307/308 lab
  • Clean, inventory, and photograph 321/623 lab

This is a list of big projects that need to be completed before the end of Summer 2011:

  • 200 Level Optics Upgrade
  • Wikify 625 Labs (Setups and Links to Writeups)
  • Wikify Photo Review
  • TA Prep Room Decimation and Move
  • Work with Billy to Rebuild e/m power supplies
  • 625 Latex Project

  • 407 Bell Violation (Brett, inventory and order parts)

This is a list of things that Brett has been meaning to do forever, but hasn't gotten around to:

  • New PMT for single photon lab
  • Fix optical pyrometer in 307

il: TasksSummer11 (last edited 2011-05-17 14:35:46 by BrettUnks)