Below is a list of jobs that need to be completed before the end of Summer 2010. Please check off items as you complete them! Below is a list of jobs that need to be completed before the end of Fall 2010. Please check off items as you complete them!
Line 4: Line 4:
 * 321 Transformers - Convert all the 6.3V transformers to accept standard AC power plugs.
 * 200 Level Optics - New glass lenses must be put into the 200 level geometric optics carts.
Line 8: Line 6:
 * [[Photo Review 2010]] - Every lab room will be restored to photo review condition. Make changes to the photo review where needed.
 * Junk room clearout and conversion to 103.
 * Switch 4136/3136
 * Clean and lubricate permanent magnet boards

Below is a list of jobs that need to be completed before the end of Fall 2010. Please check off items as you complete them!

  • Fix broken stuff - If it has a trouble card on it, fix it!
  • Eye Model De-Liming - Oh god, not this again.
  • Light blocks for Optics - New black cloths must be sized and cut (30"x30" squares)
  • Clean and lubricate permanent magnet boards

This is a list of things that Brett has been meaning to do forever, but hasn't gotten around to:

  • Resizing e/m tube mounts
  • Complete conversion of 200 level optics carts.
  • New PMT for single photon lab
  • Fix optical pyrometer in 307