Differences between revisions 2 and 3
Revision 2 as of 2010-10-26 16:56:05
Size: 666
Editor: BrettUnks
Comment:
Revision 3 as of 2010-11-01 19:16:35
Size: 690
Editor: BrettUnks
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
 * Slinkys for 109 lab

Below is a list of jobs that need to be completed before the end of Fall 2010. Please check off items as you complete them!

  • Fix broken stuff - If it has a trouble card on it, fix it!
  • Eye Model De-Liming - Oh god, not this again.
  • Light blocks for Optics - New black cloths must be sized and cut (30"x30" squares)
  • Clean and lubricate permanent magnet boards
  • 625 Latex Project

  • Slinkys for 109 lab

This is a list of things that Brett has been meaning to do forever, but hasn't gotten around to:

  • Resizing e/m tube mounts
  • Complete conversion of 200 level optics carts.
  • New PMT for single photon lab
  • Fix optical pyrometer in 307

il: TasksFall10 (last edited 2010-11-01 19:16:35 by BrettUnks)