Task List - Week #3, Fall 2009 (9/14-9/18)
Daily Lab Checks
Date |
|
Labs |
Checked By |
Time |
|
|
|
|
|
Tuesday 9/15 |
|
Third Floor |
Brett |
7a |
|
|
Fourth Floor |
Tim C. |
9:55-10:45 |
Wednesday 9/16 |
|
Third Floor |
Brett |
7a |
|
|
Fourth Floor |
Ryan |
1:00-1:30 |
Thursday 9/17 |
|
Third Floor |
Brett |
7a |
|
|
Fourth Floor |
Wittawat |
9:30-10:30 |
Note that all lab checks should be done before 7:45am on the date listed.
Equipment Changes
Date |
|
Course |
Room |
Experiment Out |
Experiment In |
Changed By |
Checked By |
Special Instructions |
|
|
|
|
|
|
|
|
|
Monday 9/15 |
|
201 |
4314 |
|
|
Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room. Do the change over between the last lab Monday and the first lab Tuesday. |
||
|
|
|
|
|
|
|
|
|
Friday 9/18 |
|
103 |
4328 |
RM / TC |
TC |
Most of the equipment used in M-1 is used in M-2 |
||
|
|
103 |
4320 |
RM / TC |
TC |
" |
||
|
|
201 |
4314 |
TC |
Wittawat |
|
||
|
|
207 |
4310 |
RM / TC |
Wittawat |
Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room. |
||
|
|
247 |
4136 |
Wittawat |
|
Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room. |
||
|
|
104 |
3320 |
Brett |
|
|
||
|
|
202 |
3314 |
Brett |
|
Electrometer and Power Supply are used in both labs |
||
|
|
202 |
3310 |
Brett |
|
" |
||
|
|
208 |
3254 |
R-1 |
R-2 |
Brett |
|
Simpler to swap out complete optical rail sets. Check distilled water supply. |