== Task List - Week #3, Fall 2009 (9/14-9/18) == === Daily Lab Checks === ||Date || ||Labs ||Checked By ||Time || || || || || || || ||Tuesday 9/15 || ||Third Floor ||Brett ||7a || || || ||Fourth Floor ||Tim C. ||9:55-10:45 || ||Wednesday 9/16 || ||Third Floor ||Brett ||7a || || || ||Fourth Floor ||Ryan ||1:00-1:30 || ||Thursday 9/17 || ||Third Floor ||Brett ||7a || || || ||Fourth Floor ||Wittawat||9:30-10:30 || Note that all lab checks should be done before 7:45am on the date listed. === Equipment Changes === ||Date || ||Course ||Room ||Experiment Out ||Experiment In ||Changed By ||Checked By ||Special Instructions || || || || || || || || || || || ||Monday 9/15 || ||201 ||4314 ||[[M-1-200|M-1]] ||[[M-4-200|M-4]] || || ||Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room. Do the change over between the last lab Monday and the first lab Tuesday. || || || || || || || || || || || ||Friday 9/18 || ||103 ||4328 ||[[M-1-100|M-1]] ||[[M-2-100|M-2]] ||RM / TC ||TC ||Most of the equipment used in M-1 is used in M-2 || || || ||103 ||4320 ||[[M-1-100|M-1]] ||[[M-2-100|M-2]] ||RM / TC ||TC ||" || || || ||201 ||4314 ||[[M-4-200|M-4]] ||[[M-5-200|M-5]] ||TC || Wittawat|| || || || ||207 ||4310 ||[[M-1-200|M-1]] ([[M-1a|a]] & [[M-1c|c]]) ||[[M-4-200|M-4]] ||RM / TC ||Wittawat||Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room. || || || ||247 ||4136 ||[[M-1-200|M-1]] ||[[M-4-200|M-4]] ||Wittawat|| ||Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room. || || || ||104 ||3320 ||[[E-2-100|E-2]] ||[[E-3-100|E-3]] ||Brett|| || || || || ||202 ||3314 ||[[E-1-200|E-1]] ||[[E-2-200|E-2]] ||Brett|| ||Electrometer and Power Supply are used in both labs || || || ||202 ||3310 ||[[E-1-200|E-1]] ||[[E-2-200|E-2]] ||Brett|| ||" || || || ||208 ||3254 ||R-1 ||R-2 ||Brett|| ||Simpler to swap out complete optical rail sets. Check distilled water supply. || ---- [[Tasks]] ##CategoryTaskArchive