Differences between revisions 21 and 22
Revision 21 as of 2009-09-18 22:46:14
Size: 3525
Editor: BrettUnks
Comment:
Revision 22 as of 2009-09-18 22:57:04
Size: 3546
Editor: dyn-79-109
Comment:
Deletions are marked like this. Additions are marked like this.
Line 22: Line 22:
||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||201 ||4314 ||[[M-4-200|M-4]] ||[[M-5-200|M-5]] ||TC || || ||
||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||207 ||4310 ||[[M-1-200|M-1]] ([[M-1a|a]] & [[M-1c|c]]) ||[[M-4-200|M-4]] ||RM / TC || ||Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room. ||
||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||201 ||4314 ||[[M-4-200|M-4]] ||[[M-5-200|M-5]] ||TC || Wittawat S.|| ||
||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||207 ||4310 ||[[M-1-200|M-1]] ([[M-1a|a]] & [[M-1c|c]]) ||[[M-4-200|M-4]] ||RM / TC ||Wittawat S.||Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room. ||

Task List - Week #3, Fall 2009 (9/14-9/18)

Daily Lab Checks

Date

Labs

Checked By

Time

Tuesday 9/15

Third Floor

Brett

7a

Fourth Floor

Tim C.

9:55-10:45

Wednesday 9/16

Third Floor

Brett

7a

Fourth Floor

Ryan

1:00-1:30

Thursday 9/17

Third Floor

Brett

7a

Fourth Floor

Wittawat S.

9:30-10:30

Note that all lab checks should be done before 7:45am on the date listed.

Equipment Changes

Date

Course

Room

Experiment Out

Experiment In

Changed By

Checked By

Special Instructions

Monday 9/15

201

4314

M-1

M-4

Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room. Do the change over between the last lab Monday and the first lab Tuesday.

Friday 9/18

103

4328

M-1

M-2

RM / TC

TC

Most of the equipment used in M-1 is used in M-2

103

4320

M-1

M-2

RM / TC

TC

"

201

4314

M-4

M-5

TC

Wittawat S.

207

4310

M-1 (a & c)

M-4

RM / TC

Wittawat S.

Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room.

247

4136

M-1

M-4

Wittawat S.

Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room.

104

3320

E-2

E-3

Brett

202

3314

E-1

E-2

Brett

Electrometer and Power Supply are used in both labs

202

3310

E-1

E-2

Brett

"

208

3254

R-1

R-2

Brett

Simpler to swap out complete optical rail sets. Check distilled water supply.


Tasks

il: TasksFall09-3 (last edited 2010-09-10 17:13:58 by BrettUnks)