Size: 3136
Comment:
|
Size: 3472
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
||<style="font-weight: bold;">Tuesday 9/15 ||<style="font-weight: bold;"> ||Third Floor || || || | ||<style="font-weight: bold;">Tuesday 9/15 ||<style="font-weight: bold;"> ||Third Floor ||Brett ||7a || |
Line 7: | Line 7: |
||<style="font-weight: bold;">Wednesday 9/16 ||<style="font-weight: bold;"> ||Third Floor || || || ||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||Fourth Floor || || || |
||<style="font-weight: bold;">Wednesday 9/16 ||<style="font-weight: bold;"> ||Third Floor ||Brett ||7a || ||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||Fourth Floor ||Ryan ||1:00-1:30 || |
Line 10: | Line 10: |
||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||Fourth Floor || || || | ||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||Fourth Floor ||Wittawat S. ||9:30-10:30 || |
Line 18: | Line 18: |
||<style="font-weight: bold;">Monday 9/15 ||<style="font-weight: bold;"> ||201 ||4314 ||M-1 ||M-4 || || ||Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room. Do the change over between the last lab Monday and the first lab Tuesday. || | ||<style="font-weight: bold;">Monday 9/15 ||<style="font-weight: bold;"> ||201 ||4314 ||[[M-1-200|M-1]] ||[[M-4-200|M-4]] || || ||Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room. Do the change over between the last lab Monday and the first lab Tuesday. || |
Line 20: | Line 20: |
||<style="font-weight: bold;">Friday 9/18 ||<style="font-weight: bold;"> ||103 ||4328 ||M-1 ||M-2 || || ||Most of the equipment used in M-1 is used in M-2 || ||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||103 ||4320 ||M-1 ||M-2 || || ||" || ||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||201 ||4314 ||M-4 ||M-5 || || || || ||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||207 ||4310 ||M-1 (a & c) ||M-4 || || ||Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room. || ||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||247 ||4136 ||M-1 ||M-4 || || ||Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room. || ||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||104 ||3320 ||E-2 ||E-3 || || || || ||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||202 ||3314 ||E-1 ||E-2 || || ||Electrometer and Power Supply are used in both labs || ||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||202 ||3310 ||E-1 ||E-2 || || ||" || |
||<style="font-weight: bold;">Friday 9/18 ||<style="font-weight: bold;"> ||103 ||4328 ||[[M-1-100|M-1]] ||[[M-2-100|M-2]] || || ||Most of the equipment used in M-1 is used in M-2 || ||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||103 ||4320 ||[[M-1-100|M-1]] ||[[M-2-100|M-2]] || || ||" || ||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||201 ||4314 ||[[M-4-200|M-4]] ||[[M-5-200|M-5]] || || || || ||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||207 ||4310 ||[[M-1-200|M-1]] ([[M-1a-200|a]] & [[M-1c-200|c]]) ||[[M-4-200|M-4]] || || ||Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room. || ||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||247 ||4136 ||[[M-1-200|M-1]] ||[[M-4-200|M-4]] || || ||Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room. || ||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||104 ||3320 ||[[E-2-100|E-2]] ||[[E-3-100|E-3]] || || || || ||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||202 ||3314 ||[[E-1-200|E-1]] ||[[E-2-200|E-2]] || || ||Electrometer and Power Supply are used in both labs || ||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||202 ||3310 ||[[E-1-200|E-1]] ||[[E-2-200|E-2]] || || ||" || |
Line 29: | Line 29: |
---- [[Tasks]] ##CategoryTaskArchive |
Task List - Week #3, Fall 2009 (9/14-9/18)
Daily Lab Checks
Date |
|
Labs |
Checked By |
Time |
|
|
|
|
|
Tuesday 9/15 |
|
Third Floor |
Brett |
7a |
|
|
Fourth Floor |
Tim C. |
9:55-10:45 |
Wednesday 9/16 |
|
Third Floor |
Brett |
7a |
|
|
Fourth Floor |
Ryan |
1:00-1:30 |
Thursday 9/17 |
|
Third Floor |
|
|
|
|
Fourth Floor |
Wittawat S. |
9:30-10:30 |
Note that all lab checks should be done before 7:45am on the date listed.
Equipment Changes
Date |
|
Course |
Room |
Experiment Out |
Experiment In |
Changed By |
Checked By |
Special Instructions |
|
|
|
|
|
|
|
|
|
Monday 9/15 |
|
201 |
4314 |
|
|
Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room. Do the change over between the last lab Monday and the first lab Tuesday. |
||
|
|
|
|
|
|
|
|
|
Friday 9/18 |
|
103 |
4328 |
|
|
Most of the equipment used in M-1 is used in M-2 |
||
|
|
103 |
4320 |
|
|
" |
||
|
|
201 |
4314 |
|
|
|
||
|
|
207 |
4310 |
|
|
Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room. |
||
|
|
247 |
4136 |
|
|
Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room. |
||
|
|
104 |
3320 |
|
|
|
||
|
|
202 |
3314 |
|
|
Electrometer and Power Supply are used in both labs |
||
|
|
202 |
3310 |
|
|
" |
||
|
|
208 |
3254 |
R-1 |
R-2 |
|
|
Simpler to swap out complete optical rail sets. Check distilled water supply. |