Differences between revisions 13 and 15 (spanning 2 versions)
Revision 13 as of 2009-09-16 14:23:48
Size: 3207
Editor: BrettUnks
Comment:
Revision 15 as of 2009-09-17 16:09:06
Size: 3472
Editor: 128
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
||<style="font-weight: bold;">Wednesday 9/16 ||<style="font-weight: bold;"> ||Third Floor ||Brett||7a|| ||<style="font-weight: bold;">Wednesday 9/16 ||<style="font-weight: bold;"> ||Third Floor ||Brett ||7a ||
Line 10: Line 10:
||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||Fourth Floor || || || ||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||Fourth Floor ||Wittawat S. ||9:30-10:30 ||
Line 18: Line 18:
||<style="font-weight: bold;">Monday 9/15 ||<style="font-weight: bold;"> ||201 ||4314 ||M-1 ||M-4 || || ||Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room. Do the change over between the last lab Monday and the first lab Tuesday. || ||<style="font-weight: bold;">Monday 9/15 ||<style="font-weight: bold;"> ||201 ||4314 ||[[M-1-200|M-1]] ||[[M-4-200|M-4]] || || ||Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room. Do the change over between the last lab Monday and the first lab Tuesday. ||
Line 20: Line 20:
||<style="font-weight: bold;">Friday 9/18 ||<style="font-weight: bold;"> ||103 ||4328 ||M-1 ||M-2 || || ||Most of the equipment used in M-1 is used in M-2 ||
||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||103 ||4320 ||M-1 ||M-2 || || ||" ||
||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||201 ||4314 ||M-4 ||M-5 || || || ||
||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||207 ||4310 ||M-1 (a & c) ||M-4 || || ||Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room. ||
||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||247 ||4136 ||M-1 ||M-4 || || ||Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room. ||
||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||104 ||3320 ||E-2 ||E-3 || || || ||
||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||202 ||3314 ||E-1 ||E-2 || || ||Electrometer and Power Supply are used in both labs ||
||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||202 ||3310 ||E-1 ||E-2 || || ||" ||
||<style="font-weight: bold;">Friday 9/18 ||<style="font-weight: bold;"> ||103 ||4328 ||[[M-1-100|M-1]] ||[[M-2-100|M-2]] || || ||Most of the equipment used in M-1 is used in M-2 ||
||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||103 ||4320 ||[[M-1-100|M-1]] ||[[M-2-100|M-2]] || || ||" ||
||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||201 ||4314 ||[[M-4-200|M-4]] ||[[M-5-200|M-5]] || || || ||
||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||207 ||4310 ||[[M-1-200|M-1]] ([[M-1a-200|a]] & [[M-1c-200|c]]) ||[[M-4-200|M-4]] || || ||Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room. ||
||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||247 ||4136 ||[[M-1-200|M-1]] ||[[M-4-200|M-4]] || || ||Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room. ||
||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||104 ||3320 ||[[E-2-100|E-2]] ||[[E-3-100|E-3]] || || || ||
||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||202 ||3314 ||[[E-1-200|E-1]] ||[[E-2-200|E-2]] || || ||Electrometer and Power Supply are used in both labs ||
||<style="font-weight: bold;"> ||<style="font-weight: bold;"> ||202 ||3310 ||[[E-1-200|E-1]] ||[[E-2-200|E-2]] || || ||" ||

Task List - Week #3, Fall 2009 (9/14-9/18)

Daily Lab Checks

Date

Labs

Checked By

Time

Tuesday 9/15

Third Floor

Brett

7a

Fourth Floor

Tim C.

9:55-10:45

Wednesday 9/16

Third Floor

Brett

7a

Fourth Floor

Ryan

1:00-1:30

Thursday 9/17

Third Floor

Fourth Floor

Wittawat S.

9:30-10:30

Note that all lab checks should be done before 7:45am on the date listed.

Equipment Changes

Date

Course

Room

Experiment Out

Experiment In

Changed By

Checked By

Special Instructions

Monday 9/15

201

4314

M-1

M-4

Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room. Do the change over between the last lab Monday and the first lab Tuesday.

Friday 9/18

103

4328

M-1

M-2

Most of the equipment used in M-1 is used in M-2

103

4320

M-1

M-2

"

201

4314

M-4

M-5

207

4310

M-1 (a & c)

M-4

Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room.

247

4136

M-1

M-4

Leave dynamics tracks on the tables. Only one M-4 apparatus goes in the room.

104

3320

E-2

E-3

202

3314

E-1

E-2

Electrometer and Power Supply are used in both labs

202

3310

E-1

E-2

"

208

3254

R-1

R-2

Simpler to swap out complete optical rail sets. Check distilled water supply.


Tasks

il: TasksFall09-3 (last edited 2010-09-10 17:13:58 by BrettUnks)