Differences between revisions 3 and 6 (spanning 3 versions)
Revision 3 as of 2013-04-11 16:25:40
Size: 378
Editor: BrettUnks
Comment:
Revision 6 as of 2013-04-12 17:43:28
Size: 658
Editor: BrettUnks
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
 * Re-write E-3
   * 0.47 uF capacitors added to plug board kits
 * L-5 grating mounts
   * Center mount on rotation axis
   * Replace grating material
Line 14: Line 19:
 * Duplicate Electrometer filters with BNC in/out - Qty 4
 * Pedestals for 4mW HeNe lasers
   * Beam height must be 4"

Summer Jobs - Small Projects

Hourly Room

  • Electronics Rack Construction

Introductory Labs

  • Paint 208 Magnets N/S
  • Re-write E-3
    • 0.47 uF capacitors added to plug board kits
  • L-5 grating mounts
    • Center mount on rotation axis
    • Replace grating material

407

  • Mount new cable racks

625

  • Organize modernization cabinets
  • Duplicate Electrometer filters with BNC in/out - Qty 4
  • Pedestals for 4mW HeNe lasers

    • Beam height must be 4"
  • Remount broken phase shifter
  • New motors for Michaelson
    • Higher speed for broader scans
    • One motor coupling is going bad

il: Summer Jobs (last edited 2013-06-20 20:16:26 by BrettUnks)