Differences between revisions 3 and 11 (spanning 8 versions)
Revision 3 as of 2013-04-11 16:25:40
Size: 378
Editor: BrettUnks
Comment:
Revision 11 as of 2013-06-20 20:16:26
Size: 919
Editor: BrettUnks
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
 * Electronics Rack Construction  * '''6/13 Done''' Electronics Rack Construction 
Line 7: Line 7:
 * 208 - Light Bulbs in RC Circuits
Line 8: Line 9:
 * Re-write E-3
   * ''' 6/18 Done''' 0.47 uF capacitors added to plug board kits
 * L-5 grating mounts
   * Center mount on rotation axis
   * Replace grating material
 * Polariscope scale mounting
 * Reflector carts for 100 level M-11
   * Are the cardboard vanes really better?

=== 109 ===

 * LED Projector Conversion
Line 14: Line 27:
 * Mounts for 1 1/8" irises
 * Duplicate Electrometer filters with BNC in/out - Qty 4
 * Pedestals for 4mW HeNe lasers
   * Beam height must be 4"

Summer Jobs - Small Projects

Hourly Room

  • 6/13 Done Electronics Rack Construction

Introductory Labs

  • 208 - Light Bulbs in RC Circuits
  • Paint 208 Magnets N/S
  • Re-write E-3
    • 6/18 Done 0.47 uF capacitors added to plug board kits

  • L-5 grating mounts
    • Center mount on rotation axis
    • Replace grating material
  • Polariscope scale mounting
  • Reflector carts for 100 level M-11
    • Are the cardboard vanes really better?

109

  • LED Projector Conversion

407

  • Mount new cable racks

625

  • Organize modernization cabinets
  • Mounts for 1 1/8" irises
  • Duplicate Electrometer filters with BNC in/out - Qty 4
  • Pedestals for 4mW HeNe lasers

    • Beam height must be 4"
  • Remount broken phase shifter
  • New motors for Michaelson
    • Higher speed for broader scans
    • One motor coupling is going bad

il: Summer Jobs (last edited 2013-06-20 20:16:26 by BrettUnks)