Differences between revisions 2 and 7 (spanning 5 versions)
Revision 2 as of 2013-04-11 16:18:31
Size: 296
Editor: BrettUnks
Comment:
Revision 7 as of 2013-04-19 18:56:39
Size: 687
Editor: BrettUnks
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
== Introductory Labs ==
Paint 208 Magnets N/S
=== Hourly Room ===
 * Electronics Rack Construction
Line 6: Line 6:
== 407 ==
Mount new cable racks
=== Introductory Labs ===
 * Paint 208 Magnets N/S
 * Re-write E-3
   * 0.47 uF capacitors added to plug board kits
 * L-5 grating mounts
   * Center mount on rotation axis
   * Replace grating material
Line 9: Line 14:
== 625 ==
Organize modernization cabinets
Remount broken phase shifter
New motors for Michaelson
 * Higher speed for broader scans
 * One motor coupling is going bad
=== 407 ===
 * Mount new cable racks

=
== 625 ===
 *
Organize modernization cabinets
 * Mounts for 1 1/8" irises
 * Duplicate Electrometer filters with BNC in/out - Qty 4
 * Pedestals for 4mW HeNe lasers
   * Beam height must be 4"
 *
Remount broken phase shifter
 * New motors for Michaelson
   * Higher speed for broader scans
   * One motor coupling is going bad

Summer Jobs - Small Projects

Hourly Room

  • Electronics Rack Construction

Introductory Labs

  • Paint 208 Magnets N/S
  • Re-write E-3
    • 0.47 uF capacitors added to plug board kits
  • L-5 grating mounts
    • Center mount on rotation axis
    • Replace grating material

407

  • Mount new cable racks

625

  • Organize modernization cabinets
  • Mounts for 1 1/8" irises
  • Duplicate Electrometer filters with BNC in/out - Qty 4
  • Pedestals for 4mW HeNe lasers

    • Beam height must be 4"
  • Remount broken phase shifter
  • New motors for Michaelson
    • Higher speed for broader scans
    • One motor coupling is going bad

il: Summer Jobs (last edited 2013-06-20 20:16:26 by BrettUnks)