Size: 173
Comment:
|
Size: 885
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
==Introductory Labs== | == Summer Jobs - Small Projects == |
Line 3: | Line 3: |
==407== | === Hourly Room === * Electronics Rack Construction |
Line 5: | Line 6: |
==625== Remount broken phase shifter New motors for Michaelson * Higher speed for broader scans * One motor coupling is going bad |
=== Introductory Labs === * 208 - Light Bulbs in RC Circuits * Paint 208 Magnets N/S * Re-write E-3 * 0.47 uF capacitors added to plug board kits * L-5 grating mounts * Center mount on rotation axis * Replace grating material * Polariscope scale mounting * Reflector carts for 100 level M-11 * Are the cardboard vanes really better? === 109 === * LED Projector Conversion === 407 === * Mount new cable racks === 625 === * Organize modernization cabinets * Mounts for 1 1/8" irises * Duplicate Electrometer filters with BNC in/out - Qty 4 * Pedestals for 4mW HeNe lasers * Beam height must be 4" * Remount broken phase shifter * New motors for Michaelson * Higher speed for broader scans * One motor coupling is going bad |
Summer Jobs - Small Projects
Hourly Room
- Electronics Rack Construction
Introductory Labs
- 208 - Light Bulbs in RC Circuits
- Paint 208 Magnets N/S
- Re-write E-3
- 0.47 uF capacitors added to plug board kits
- L-5 grating mounts
- Center mount on rotation axis
- Replace grating material
- Polariscope scale mounting
- Reflector carts for 100 level M-11
- Are the cardboard vanes really better?
109
- LED Projector Conversion
407
- Mount new cable racks
625
- Organize modernization cabinets
- Mounts for 1 1/8" irises
- Duplicate Electrometer filters with BNC in/out - Qty 4
Pedestals for 4mW HeNe lasers
- Beam height must be 4"
- Remount broken phase shifter
- New motors for Michaelson
- Higher speed for broader scans
- One motor coupling is going bad