Differences between revisions 4 and 5
Revision 4 as of 2019-10-15 17:50:46
Size: 987
Editor: BrettUnks
Comment:
Revision 5 as of 2019-10-15 17:55:32
Size: 1146
Editor: BrettUnks
Comment:
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:
Assemble the following:
Line 11: Line 13:
 * 1 [[4327-9#Super_Pulley|Super pulley]] w/ [[4327-9#Steel_Rod|Threaded Steel Rod]]
 * 1 [[4327-2#Blue_Right-Angle_Clamp|Right-Angle Clamp]]

Assembly the following and attach to end of table:
Line 13: Line 20:
 * 1 [[4327-9#Super_Pulley|Super pulley]] w/ [[4327-9#Steel_Rod|Threaded Steel Rod]]
Line 15: Line 21:
 * 2 [[4327-2#Blue_Right-Angle_Clamp|Right-Angle Clamp]]  * 1 [[4327-2#Blue_Right-Angle_Clamp|Right-Angle Clamp]]

Other items:

Lab 5: Torque, Force, and Beam Balance Scales

Setup

Experiment Contents

Assemble the following:

Assembly the following and attach to end of table:

Other items:

  • 1 Level

  • 1 Protracter

  • 1 Old Hardcover Book (In 4320/4328)
  • 1 Meter stick w/ holes at both ends (On wall in 4320/4328)
  • 1 Medium-sized Binder Clip (In 4320/4328 Cabinet)

Check

  • Digital scale
  • String spool is at least half full
  • Triple-beam balance in room


100 Level Index

il: REACH-103-5 (last edited 2019-10-15 17:55:32 by BrettUnks)