Differences between revisions 2 and 3
Revision 2 as of 2018-09-06 20:27:14
Size: 641
Editor: BrettUnks
Comment:
Revision 3 as of 2019-08-26 17:31:54
Size: 968
Editor: BrettUnks
Comment:
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:
 * 1 1/2" T-stand
 * 1 1/2" Short Steel Rod
 * 1 Right-Angle Steel Rod
 * 3 Right-Angle Clamp
 * 1 Level
 * 1 Portracter
 * 2 Universal Table Clamps
 * 1 Super pulley w/ Threaded Steel Rod
 * 1 Meter stick w/ holes at both ends
 * 1 Medium-sized Binder Clip
 * 1 [[4327-1#S-W_T-Base_1.2F2.22_Support_Stand| 1/2" T-Stand]]
 * 1 [[4327-2#Large_.281.2F2.22.29_Stainless_Steel_Rod| 1/2" Short Steel Rod]]
 * 1 [[4327-3#MC-8_Steel_Rod| Right-Angle Steel Rod]]
 * 3 [[4327-2#Blue_Right-Angle_Clamp|Right-Angle Clamp]]
 * 1 [[4327-3#Level|Level]]
 * 1 [[4327-3#Protractor|Protracter]]
 * 2 [[4327-2#Universal_Table_Clamp|Universal Table Clamps]]
 * 1 [[4327-9#Super_Pulley|Super pulley]] w/ [[4327-9#Steel_Rod|Threaded Steel Rod]]
 * 1 Meter stick w/ holes at both ends (On wall in 4320/4328)
 * 1 Medium-sized Binder Clip (In 4320/4328 Cabinet)
Line 23: Line 23:
 * Digital Scale
 * String Spool
* Weights Box
* Plastic Rulers
 * Triple-beam balances
 * Digital scale on TA desk
 * String spool is at least half full
 * Triple-beam balance in room

Lab 5: Torque, Force, and Beam Balance Scales

Setup

Experiment Contents

Check

  • Digital scale on TA desk
  • String spool is at least half full
  • Triple-beam balance in room


100 Level Index

il: REACH-103-5 (last edited 2019-10-15 17:55:32 by BrettUnks)