Size: 589
Comment:
|
Size: 885
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 4: | Line 4: |
=== M-2: Torque, Force, and Lever Arm === | === M-10: Torque, Force, and Lever Arm === |
Line 9: | Line 9: |
[[attachment:M2-100 Setup.png|{{attachment:M2-100 Setup.png||width=500 height=210}}]] | [[attachment:M10-103setup.png|{{attachment:M10-103setup.png||width=500 height=210}}]] |
Line 11: | Line 11: |
[[attachment:M2-100 Operation.png|{{attachment:M2-100 Operation.png||width=500 height=210}}]] | [[attachment:M10-103op.png|{{attachment:M10-103op.png||width=500 height=210}}]] |
Line 13: | Line 13: |
* [[4327-1#S-W_T-Base_1.2BAC8-2.22_Support_Stand|0.5 in. T-Stand]] * |
* 2 [[4327-1#S-W_T-Base_1.2BAC8-2.22_Support_Stand|0.5 in. T-Stand]] * 2 [[4327-3#MC-8 Steel Rod| Right-Angle Steel Rod]] * 3 [[4327-2#Blue Right-Angle Clamp| Right-Angle Clamp]] * 1 [[4327-3#Level| Level]] * 1 [[4327-2#Universal Table Clamp|Universal Table Clamp]] * w/ [[4327-2#Large (1/2") Stainless Steel Rod|1/2" Support Rod]] * 1 [[4327-9#Super_Pulley|Super Pulley]] * w/ [[4327-9#Steel_Rod|Threaded Steel Rod]] |
Line 17: | Line 22: |
* Computer Set-Up (PC, Interface On Before Computer, Sensors Work) | * White String |
M-10: Torque, Force, and Lever Arm
Quantity: ?
- Lab Table Setup
- Operation
Experiment Contents
1 Level
Check
- White String