Size: 709
Comment:
|
← Revision 27 as of 2016-01-25 22:13:17 ⇥
Size: 895
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
=== Setup === | |
Line 9: | Line 10: |
=== Operation === |
|
Line 10: | Line 13: |
Line 16: | Line 17: |
* 1 [[Miscellaneous#PASCO_Dynamics_Track|PASCO Dynamics Track]] | |
Line 18: | Line 20: |
* w/ [[4327-4#Steel vane|Steel Vane]] * 2 [[4327-4#Cart_Mass|500g Steel Blocks]] |
M-1: Systematic Error
Quantity: 45
Setup
Operation
Experiment Contents
- 1 PC and Interface
w/ cable
w/ 1/4" T-Stand
w/ Steel Vane
Check
- Computer Set-Up (PC, Interface On Before Computer, Sensors Work)
Make Sure Lab Has Graph Paper