Differences between revisions 3 and 4
Revision 3 as of 2011-04-20 18:57:28
Size: 801
Editor: dhcp-115
Comment:
Revision 4 as of 2011-07-20 17:51:27
Size: 1114
Editor: fzx32547
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
 * 1 Dewar Flask (Large, Small)
 * 1 Aluminum Cylinder
 * 1 2-Beam Balance
 * 1 Pasco Force Sensor
  * w/ 0.5 in. T-Stand
  * w/ Rod (0.5 in. Dia. x 8 in. L.)
  * w/ Right Angle Clamp
 * 1 Dewar Flask ([[4325-2#Large_DEWAR_Flask|Large]], [[4325-2#Small_DEWAR_Flask|Small]])
 * 1 [[4325-1#Aluminum_Air_Chamber|Aluminum Cylinder]]
 * 1 [[4325-4#Ohaus_2-Beam_Harvard_Trip_Balance|2-Beam Balance]]
 * 1 [[4327-4#PASCO_Force_Sensor_Cart|PASCO Force Sensor]]
  * w/ [[4327-1#S-W_T-Base_1.2BAC8-2.22_Support_Stand|0.5 in. T-Stand]]
  * w/ [[4327-2#Large_.281.2BAC8-2.22.29_Stainless_Steel_Rod|Rod (0.5 in. Dia. x 8 in. L.)]]
  * w/ [[4327-2#Thorlabs_Right-Angle_Clamp|Right Angle Clamp]]

H-3: Latent Heat of Vaporization of Liquid N2

[ATTACH]

Experiment Contents

Also
  • 1 100L Dewar Liquid N2 (In 4329)
  • 1 Weight Box w/50g Weight Hangers (In Lab)

Check

  • Computer Set-Up (PC, Interface On Before Computer, Sensors Work)
  • Zero 2-Beam Balances Properly
  • 100L Dewar Filled (In 4329)


100 Level Index

Liquid Nitrogen Filling Procedure

il: H-3-100 (last edited 2019-07-25 18:02:08 by BrettUnks)