Differences between revisions 6 and 17 (spanning 11 versions)
Revision 6 as of 2011-07-20 19:55:04
Size: 1233
Editor: fzx32547
Comment:
Revision 17 as of 2018-06-04 17:30:22
Size: 1707
Editor: BrettUnks
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
## page was renamed from H-1-200
Line 6: Line 7:
==== Quantity: 24 ====
Line 8: Line 10:
 * Lab Table Setup
Line 9: Line 12:
[[attachment:H1 Setup.png|{{attachment:H1 Setup.png|attachment:H1 Setup.png|width="500 height=323"}}]]
Line 10: Line 14:
 * Operation
Line 11: Line 16:
{{attachment:H-1-200.png|H-2|width=500}} [[attachment:H1 Operation.png|{{attachment:H1 Operation.png|attachment:H1 Operation.png|width="500 height=323"}}]]
Line 13: Line 19:
 * 1 PC & Interface  * 1 PASCO 850 Universal Interface
Line 17: Line 23:
 * 1 Dewar Flask ([[4325-2#Large_DEWAR_Flask|Large]], [[4325-2#Small_DEWAR_Flask|Small]])  * 1 [[4325-2#Small_DEWAR_Flask|Dewar Flask]]
Line 21: Line 27:
  * w/ [[4325-3#Temperature_Probe|Probe]] (Long, Short)
 * 1 [[4325-3#Plastic_Syringe|60cc Plastic Syringe]]
  * w/ [[4325-3#Temperature_Probe_Long.2BAC8-Short|Probe]] (Long, Short)
 * 1 [[4325-3#Plastic_Syringe|60cm^3 Plastic Syringe]]
Line 26: Line 33:
 * 1 Sponge  * 1 4L Dewar for Lab Room
Line 28: Line 36:
 * Plug pressure sensor in to Pasco interface
 * Fill steam generators with de-ionized water (to within 1" of rim)
 * Check that thermometer and probe give sensible readings (room temperature)
Line 31: Line 42:
Line 34: Line 46:


[[LiquidNitrogenFilling| Liquid Nitrogen Filling Procedure]]
[[LiquidNitrogenFilling|Liquid Nitrogen Filling Procedure]]

H-1: The Ideal Gas Law & Absolute Zero

Quantity: 24

  • Lab Table Setup

attachment:H1 Setup.png

  • Operation

attachment:H1 Operation.png

Experiment Contents

Also

Check

  • Plug pressure sensor in to Pasco interface
  • Fill steam generators with de-ionized water (to within 1" of rim)
  • Check that thermometer and probe give sensible readings (room temperature)
  • Computer Set-Up (PC, Interface On Before Computer, Sensors Work)
  • 100L Dewar & Ice Chest Filled (In 4329)

  • Extra Paper Towels


200 Level Index

Liquid Nitrogen Filling Procedure

il: H-201 (last edited 2019-10-29 16:24:44 by BrettUnks)