Differences between revisions 3 and 18 (spanning 15 versions)
Revision 3 as of 2009-09-16 20:43:25
Size: 762
Editor: 128
Comment:
Revision 18 as of 2019-10-29 16:24:44
Size: 1886
Editor: BrettUnks
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
## page was renamed from H-1-200
Line 6: Line 7:
==== Quantity: 24 ====
Line 8: Line 10:
 * Lab Table Setup

[[attachment:H1 Setup.png|{{attachment:H1 Setup.png|attachment:H1 Setup.png|width="500 height=323"}}]]

 * Operation

[[attachment:H1 Operation.png|{{attachment:H1 Operation.png|attachment:H1 Operation.png|width="500 height=323"}}]]
Line 9: Line 19:
 * 1 PC & Interface
 * 1 Pasco Bracket-Mounted Pressure Sensor
  * w/1/4" T-Stand
 * 1 Constant Volume Can
 * 1 Dewar Flask (Large, Small)
 * 1 1,000mL Plastic Beaker
 * 1 Pasco Steam Generator
 * 1 Fluke Digital Thermometer
  * w/Probe (Long, Short)
 * 1 60cc Plastic Syringe
 * 1 PASCO 850 Universal Interface
 * 1 [[4325-3#PASCO_Pressure_Sensor|PASCO Bracket-Mounted Pressure Sensor]] (Plug sensor into Channel A)
  * w/ [[4327-1#S-W_T-Base_1.2BAC8-4.22_Support_Stand|1/4" T-Stand]]
 * 1 [[4325-3#Constant_Volume_Can|Constant Volume Can]]
 * 1 [[4325-2#Small_DEWAR_Flask|Dewar Flask]]
 * 1 [[4325-3#A1000mL_Plastic_Beaker|1,000mL Plastic Beaker]]
 * 1 [[4325-1#PASCO_Steam_Generator|PASCO Steam Generator]] (Fill to 1" of top with DI water from 4329)
 * 1 [[4325-3#Fluke_Digital_Thermometer|Fluke Digital Thermometer]] (Check batteries and check for reasonable room temperature)
  * w/ [[4325-3#Temperature_Probe_Long.2BAC8-Short|Probe]] (Long, Short)
 * 1 [[4325-3#Plastic_Syringe|60cm^3 Plastic Syringe]] (Make sure measurement markings are readable)
Line 20: Line 31:
 * 1 Ice Bucket w/Cover  * 1 [[4325-2#Ice_Bucket|Ice Bucket w/Cover]]
Line 22: Line 33:
 * 1 Sponge  * 1 4L Dewar for Lab Room
Line 24: Line 36:
 * Plug pressure sensor in to Pasco interface
 * Fill steam generators with de-ionized water (to within 1" of rim)
 * Check that thermometer and probe give sensible readings (room temperature)
Line 27: Line 42:
Line 29: Line 45:

[[LiquidNitrogenFilling|Liquid Nitrogen Filling Procedure]]

H-1: The Ideal Gas Law & Absolute Zero

Quantity: 24

  • Lab Table Setup

attachment:H1 Setup.png

  • Operation

attachment:H1 Operation.png

Experiment Contents

Also

Check

  • Plug pressure sensor in to Pasco interface
  • Fill steam generators with de-ionized water (to within 1" of rim)
  • Check that thermometer and probe give sensible readings (room temperature)
  • Computer Set-Up (PC, Interface On Before Computer, Sensors Work)
  • 100L Dewar & Ice Chest Filled (In 4329)

  • Extra Paper Towels


200 Level Index

Liquid Nitrogen Filling Procedure

il: H-201 (last edited 2019-10-29 16:24:44 by BrettUnks)