Differences between revisions 1 and 9 (spanning 8 versions)
Revision 1 as of 2010-10-26 17:01:06
Size: 240
Editor: BrettUnks
Comment:
Revision 9 as of 2010-11-23 16:38:44
Size: 754
Editor: dhcp-68
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:

Line 5: Line 3:
Line 7: Line 4:
Line 11: Line 7:
=== 10/27 === === 10/28 ===
== Week 10 ==
=== 11/1 625 ===
 * Till c2_4
Line 13: Line 12:
=== 10/28 === === 11/4 ===
 . Till c2_7. Figures for c2_8 and c2_9 have been transformed to png files
Line 15: Line 15:
== Week 10 == == Week 11 ==
11/8 The left of ch2; meeting

11/9: Modify. Only changing htb to tb does not remove the large figures to the right place.

11/11 Modification. I don't know why [tb]s still don't work; only [tbp]s work finally.

== Week 12 ==
Modification and Ch3

== Week 13 ==
11/22 Finish Ch3 and all the png figures for Ch4.

11/22 Problems in Ch3 are put in the Instruction folder. Continue on Ch4.

Daily Progress Reports for the 625 Latex Project

Week 9

10/26

  • Met with Jim and Steve to discuss assignment changes
  • Established 625 progress report page

10/28

Week 10

11/1 625

  • Till c2_4

11/4

  • Till c2_7. Figures for c2_8 and c2_9 have been transformed to png files

Week 11

11/8 The left of ch2; meeting

11/9: Modify. Only changing htb to tb does not remove the large figures to the right place.

11/11 Modification. I don't know why [tb]s still don't work; only [tbp]s work finally.

Week 12

Modification and Ch3

Week 13

11/22 Finish Ch3 and all the png figures for Ch4.

11/22 Problems in Ch3 are put in the Instruction folder. Continue on Ch4.