== project title == Valuable clean drinking water is literally being flushed down the toilet every time you use the bathroom, wasting water and money.
Line 14: Line 15:
== overall goals == '''Overall Goal'''
Line 16: Line 17:
== summary of sources == The goal of this project will be to construct a toilet that gets all of its water supply by recycling used water from the shower and sink.
Line 18: Line 19:
== project timeline == '''Timeline'''
Line 20: Line 21:
== resources needed == 9/30 – Compile Resources, Discuss Design Challenges
Line 22: Line 23:
== milestones (report and presentation, etc) == 10/7 – Develop Design10/14 – Develop Design

10/21 – Finalize Design and Materials Needed

10/28 – Inventory Materials, Begin Fabrication

11/4 - Continue Fabrication (Water Collection / Filtration)

11/11 - Continue Fabrication (Pumping Collected Water)

11/18 - Continue Fabrication (Integration into Toilet)

11/25 - Continue Fabrication, Work on Presentation

12/2 – Complete Fabrication, Finalize Presentation

12/9 – Demonstrate Prototype

'''Milestones'''·

Finalize Design and Order Materials, October 21^st^·

Complete Fabrication, December 2^nd^ ·

Demonstrate Prototype, December 9^th^

''' ''''''Resources Needed'''

A generous grant from the Wisconsin Energy Institute will provide funding for our project. The Physics Garage will provide the space and equipment needed to develop our project.

'''Summary of Sources'''

The Issue

Valuable clean drinking water is literally being flushed down the toilet every time you use the bathroom, wasting water and money.

Overall Goal

The goal of this project will be to construct a toilet that gets all of its water supply by recycling used water from the shower and sink.

Timeline

9/30 – Compile Resources, Discuss Design Challenges

10/7 – Develop Design10/14 – Develop Design

10/21 – Finalize Design and Materials Needed

10/28 – Inventory Materials, Begin Fabrication

11/4 - Continue Fabrication (Water Collection / Filtration)

11/11 - Continue Fabrication (Pumping Collected Water)

11/18 - Continue Fabrication (Integration into Toilet)

11/25 - Continue Fabrication, Work on Presentation

12/2 – Complete Fabrication, Finalize Presentation

12/9 – Demonstrate Prototype

Milestones·

Finalize Design and Order Materials, October 21st·

Complete Fabrication, December 2nd ·

Demonstrate Prototype, December 9th

Resources Needed

A generous grant from the Wisconsin Energy Institute will provide funding for our project. The Physics Garage will provide the space and equipment needed to develop our project.

Summary of Sources