[:PiraScheme#Mechanics: Table of Mechanics Demonstration] |
[:MEEquipmentList: List of Mechanics Equipment & Supplies] |
[:Demonstrations:Lecture Demonstrations] |
Double Cone on Rails, 1J11.50
Topic and Concept:
[:RigidBodies#ExceedingCofG: 1J11. Statistics of Rigid Bodies, Exceeding the Center of Gravity]
Location:
Cabinet: [:MechanicsCabinet:Mechanic (ME)]
Bay: [:MechanicsCabinetBayA:(A)]
Shelf: #
attachment:ConeRails02-400.jpg
Abstract:
As a double cone moves up a set of inclined rails, its center of gravity is lowered to the height of the rails.
Equipment |
Location |
ID Number |
|
|
|
Double Cone and Incline |
ME, Bay , Shelf # |
|
Important Setup Notes:
- N/A
Setup and Procedure:
- Place the inclined rails on a level surface.
- Place the double cone at the bottom of the incline with its center between the rails.
Cautions, Warnings, or Safety Concerns:
- N/A
Discussion:
Discuss the physics behind the demonstration, explaining some of the various steps of the demonstration when appropriate.
attachment:ConeRails03-250.jpg |
attachment:ConeRails04-250.jpg |
Videos:
[https://www.youtube.com/user/LectureDemostrations/videos?view=1 Lecture Demonstration's Youtube Channel]
References:
- List any references
[:Instructional:Home]