Differences between revisions 1 and 2
Revision 1 as of 2012-10-19 23:11:31
Size: 1585
Editor: srnarf
Comment:
Revision 2 as of 2012-10-19 23:12:04
Size: 1585
Editor: srnarf
Comment:
Deletions are marked like this. Additions are marked like this.
Line 14: Line 14:
 attachment:ConeRails02-400.jpg  attachment:ConeRails03-400.jpg
Line 42: Line 42:
||attachment:ConeRails03-250.jpg||attachment:ConeRails04-250.jpg|| ||attachment:ConeRails02-250.jpg||attachment:ConeRails04-250.jpg||

[:PiraScheme#Mechanics: Table of Mechanics Demonstration]

[:MEEquipmentList: List of Mechanics Equipment & Supplies]

[:Demonstrations:Lecture Demonstrations]

Double Cone on Rails, 1J11.50

Topic and Concept:

Location:

  • Cabinet: [:MechanicsCabinet:Mechanic (ME)]

  • Bay: [:MechanicsCabinetBayA:(A)]

  • Shelf: #

    attachment:ConeRails03-400.jpg

Abstract:

As a double cone moves up a set of inclined rails, its center of gravity is lowered to the height of the rails.

Equipment

Location

ID Number

Double Cone and Incline

ME, Bay , Shelf #

Important Setup Notes:

  • N/A

Setup and Procedure:

  1. Place the inclined rails on a level surface.
  2. Place the double cone at the bottom of the incline with its center between the rails.

Cautions, Warnings, or Safety Concerns:

  • N/A

Discussion:

Discuss the physics behind the demonstration, explaining some of the various steps of the demonstration when appropriate.

attachment:ConeRails02-250.jpg

attachment:ConeRails04-250.jpg

Videos:

References:

  • List any references

[:Instructional:Home]

fw: Double_Cone_on_Rails (last edited 2016-06-23 21:14:48 by srnarf)